1358 S FLOWER ST WAS BRANCH 1 FIRE
03-10-25 03:23 AM | mssb
|
BRANCH 1 (2ND STRUCTURE FIRE) KNOCKDOWN
03-10-25 03:21 AM | mssb
|
HEAVY EQUIPMENT REQUESTED
03-10-25 02:50 AM | mssb
|
PER DWP, POWER LINES IN ALLEY HAVE BEEN DE-ENERGIZED
03-10-25 02:45 AM | mssb
|
BUILDING & SAFETY ENROUTE
03-10-25 02:44 AM | mssb
|
GETTING WATER ON HOPE ST STRUCTURE VIA THE PARKING STRUCTURE NEXT DOOR
03-10-25 02:43 AM | mssb
|
KNOCKDOWN ON INITIAL FIRE BUILDING, DEFENSIVE MODE ON ADD'L FIRE BUILDINGS SOUTH OF.
03-10-25 02:42 AM | mssb
|
1355 HOPE ST, 5-STORY CENTER HALLWAY STRUCTURE, EXPOSURE TO REAR, REQ SHELTER-IN-PLACE
03-10-25 02:41 AM | mssb
|
BRANCH 1, TAC 15
03-10-25 02:39 AM | mssb
|
1355 HOPE ST NOW IS EXPOSED TO FIRE. REQ ADD'L TF
03-10-25 02:37 AM | mssb
|
DIV ALPHA ON ORIGINAL FIRE BUILDING HAS KNOCKDOWN W/ PRIMARY & SECONDAY SEARCHES COMPLETE.
03-10-25 02:33 AM | mssb
|
REQUEST FOR PIO TO CP
03-10-25 02:30 AM | mssb
|
DIV ALPHA HAS KNOCKDOWN ON ORIGINAL FIRE BUILDING, BRANCH 1 HEAVY FIRE ON SECONDARY FIRE
03-10-25 02:26 AM | mssb
|
PREPPING LADDER PIPE OPERATIONS
03-10-25 02:24 AM | mssb
|
2-STORY VACANT, 1-STORY VACANT, & COMMERCIAL ROW ALL ACTIVE FIRES.
03-10-25 02:17 AM | mssb
|
BRANCH 1 BUILDING HEAVY FIRE
03-10-25 02:15 AM | mssb
|
BRANCH 1 FOR ADD'L FIRE. FORCING ENTRY
03-10-25 02:14 AM | mssb
|
ADD'L FIRE TWO STRUCTURES SOUTH OF INITIAL INCIDENT LOC. CREATING A BRANCH FOR THAT FIRE
03-10-25 02:10 AM | mssb
|
DEFENSIVE MODE POSTURE
03-10-25 02:00 AM | mssb
|
METRO TRACKS SHUT DOWN.
03-10-25 02:00 AM | mssb
|
NO EXPOSURES, WELL INVOLVED INSIDE GROUND FLOOR, WATER ON SHORTLY
03-10-25 01:55 AM | mssb
|
REQUIRE METRO NOTIFICATION TO SHUT DOWN TRACKS AT FLOWER
03-10-25 01:53 AM | mssb
|
2-STORY COMMERCIAL PROPERTY, PREVIOUS BURN LOC, WELL INVOLVED.
03-10-25 01:52 AM | mssb
|